Dave Ledwig, REALTOR® Cell: 781-985-8750
|
SOLD 9 Rublee Street Asking $479,000 Beautiful & spacious 7 room 3 bed 2 full bath Arlington Heights Cape w/ open floorplan!
Newly added 2nd floor bathroom / large family room with new hardwood floors / 200 AMP service / 2010 roof / … Appreciate the dead-end street location! Close to Dallin Elementary School & public transportation to Alewife subway or Harvard!
Photos - Floorplans - MBTA buses / Location - Contact Dave
Questions? Request a showing of 9 Rublee Street! Call Dave at 781-985-8750 EMAIL: Dave@DaveMoves.com
|
9 Rublee Street Arlington, MA
|
Information about the property described above was provided solely by seller(s) without verification by the broker(s) therefore broker(s) is/are not responsible for the accuracy of the information contained herein. Buyer should take any and all steps necessary to verify said information. Offering is subject to prior sale, price change or withdrawal without notice. An Equal Opportunity Employer. Equal Housing Opportunity.
|
Dave Ledwig • RE/MAX Leading Edge • 319 Massachusetts Avenue, Arlington, MA 02474 Cell 781-985-8750 • Dave@DaveMoves.com
|


Recent improvements:
FLOOR:
New hardwood floor for family room
Refinish old hardwood floor (entire house)
New kitchen tile-floor
Removed basement tile
STAIRWAY:
Installed new stair railing
New wood railing in family room
WALLS:
Removed wall paper (entire first floor)
Painted entire house (inside)
BATHROOMS:
New full bathroom upstairs (where there was no bathroom)
Changed shower valve (old bathroom)
Added shut off valve for water lines
Replaced faucet
ELECTRICAL:
New 200AMP electrical service and circuit board
New wiring for dishwasher, disposal
New wiring for 2nd floor bathroom
Replaced all wall outlets/switches
Programmable wall switch
Recessed lights in kitchen
Upstairs bedroom light fixtures replaced
Basement new wiring for washer/dryer
LAUNDRY:
New dryer and setup (new gas hookup, vent location)
Created laundry area with new plumbing (entire water supply, drainage system etc)
PLUMBING:
New plumbing -- entire house drainage/vent system
Added shut off valves for main water line, bathroom water supplies
KITCHEN:
New appliances
New dishwasher and disposal (there was none to begin with)
New faucet and sprayer
WINDOW:
New window for 2nd floor bathroom
Family-room picture window frame/sill replaced
PORCH:
Replaced porch posts with pressure treated 4x4
Removed old framing and walls
EXTERIOR:
Painted window shutters, doors, trim, concrete foundation
YARD:
Removed and uprooted 12 old trees/bushes and planted new plants
Removed ivy from the back yard (about 1500 sq ft) and tilled the yard and planted new seed.
Created stepping stone walk way -- side of the house.
Removed raised concrete flower bed, removed stone base for old fountain
Cut down many branches, which were close to the house/roof